Project Showcase

Organization: Cintas
Project Dates: February 2008 – Present

Service: TechSite provided complete Turnkey services for a new Tier II/III data center. The project involved the renovation of an existing distribution center space at the Cintas Home Office. A new, independent power system was designed and installed to support the Critical Systems. The power system includes a generator, transfer switches, UPS systems and UPS distribution units. The cooling design utilizes exterior glycol heat rejection units and Computer Room Air Conditioners situated in the critical spaces. Structured cabling systems were designed and implemented for this facility in addition to fully featured infrastructure monitoring which allows load analysis down to the rack level. The project included the design and installation of Print and Staging Rooms and a Command Center with a War Room, in addition to a 7,000 square foot server equipment room.